When I built the boat I didn’t take the time to over drill fastener holes and then fill with thickened epoxy. So as I have been epoxying things I’ve started working on the holes. I also shortened the oarlock pads since the bolts didn’t actually land in the doubler underneath the deck. That was a measurement error on my part in the rush to get the boat ready for a vacation. Here’s how to enlarge an existing hole with a Forstner bit.
I’ve never been happy with the slot in the end of the sprit that catches a loop of line in the sail’s peak. So I filled it with a block of wood which I’ll smooth down and then drill a bee hole though. I’m planning to have a long length of line tied into the peak which will go through the bee hole and down the sprit to a cleat. That should make it easier to get the sail rigged.
The hard rubber rollers on my trailer have started chewing up the edges of the keel, so I hoisted the boat off the trailer with a chain fall so I could get under there to sand and epoxy. A strap around the main thwart almost perfectly balances the boat, and a line to the bow fitting keeps it from nosing down. I’ve also started painting the bare spots to build them up a bit before I paint everything else.
I’m hoping to have the boat done by the end of the month. Hopefully everything will go well and I’ll be sailing soon.