Here’s a few improvements I’ve been working on lately.
Got the area around the new hatch painted and the hatch installed with butyl tape. The #10 screws on the sides fasten to the new stiffeners I added underneath and on the ends are machine screws through the 1/4″ plywood sternsheets. This will really improve access and keep the bilge water out. I faired the front well enough you’d never know there used to be a hatch there.
I epoxied an oak peg onto the top of the mast when I was experimenting with my topsail, but it ended up not working very well. It was too hard to slip a loop of line on the topmast around it, and using it to route a halyard didn’t work either. Plus it also tended to mess with the set of the jib halyard turning block.
I chiseled off most of the peg and sanded the rest smooth. I need to figure out something for the topmast halyard, there might be just enough room for another beehole in the middle.
The boom jaws have been gouging the mast a bit so I sanded back the varnish and will epoxy some left over 6oz fiberglass around once it warms up. I knew keeping the scraps from fiberglassing the hull would come in useful someday!
I also plan to touch up the paint and varnish, but that’ll have to wait for warmer weather. It’s been freezing here in Virginia lately and it doesn’t look like it’ll let up any time soon. The topsides are in fairly decent shape, but there’s a few spots underneath that got worn off when I dragged the boat across a sandbar at Ocracoke last summer.